Home Products News Contact Us
Home > Supports > Diesel Engine > Tools Used to Check Volvo Diesel Engine

Tools Used to Check Volvo Diesel Engine

May. 23, 2018


Checking signal cable, rail pressure sensor

 

Tools:

885675 Break-out cable

88890074 Multimeter

1 Cut the current with the main switch.

2 Disconnect the connector from the sensor.

3 Connect break-out cable 885675 to the cable harness connector to the engine control unit.

4 Use multimeter 88890074 to do resistance measurement against the engine control unit.

 

 

Measurement points

Nominal value

1-2

R ≈ 4.0–5.0 kΩ

 

 

NOTICE! Measurement is done to eliminate short circuiting or breaks in the cable to the engine control unit.

 

Checking injection control pressure sensor

Tools:

885675 Break-out cable

88890074 Multimeter

1 Turn ignition off.

2 Disconnect the connector from the sensor.

3 Connect break-out cable 885675 between the sensor and the engine control unit.

4 Use multimeter 88890074 for voltage measurement.

5 Turn ignition on.

 

 

Measurement points

Nominal value

1-2

U ≈ 0,5 V*

 

* At normal atmospheric pressure.

 

Checking the wiring to the MPROP valve

Tools:

88890074 Multimeter

NOTICE! If any of the measurements shows an abnormal value, check the wiring to and from the engine interface.

1 Cut the current with the main switch.

2 Remove the connector to the MPROP.

3 Remove connector A from the EMS2.

4 Use multimeter 88890074 to do a resistance measurement against the engine control unit connector A.

 

Measurement points

Nominal value

2 (885675) – 16 (EMS 2, conn. A)

R ≈ 0 Ω

2 (885675) – 12 (EMS 2, conn. A)

R ≈ ∞ Ω

1 (885675) – 16 (EMS 2, conn. A)

R ≈ ∞ Ω

1 (885675) – 12 (EMS 2, conn. A)

R ≈ 0 Ω

 

Checking the solenoid in the MPROP valve

Tools:

885675 Break-out cable

88890074 Multimeter

1 Cut the current with the main switch.

2 Remove the connector from the MPROP valve. Connect break-out cable 885675 to the valve.

NOTICE! Do not connect the other end of the adapter cable to the engine cable harness, since

this can cause a measurement error.

3 Use multimeter 88890074 to check the resistance in the solenoid in the MPROP valve.

NOTICE! Measurement is done to eliminate short circuiting or breaks in the MPROP valve.

 

Measurement points

Nominal value

1–2

R ≈ 2–4 Ω at 20 °C (68 °F)

 

VODIA Log Parameters

Logging throttle signal with Vodia

To verify the throttle signal on the J1587 bus do as follow:

1 Choose “Log test” under the “Service and maintenance”meny.

2 Choose “MID 128, Accelerator Pedal Position” and “MID 144, Throttle Calibrated Position” and press play.

3 Verify that booth throttle values displayed in percentage by Vodia changes simultaneous while moving the throttle.

 

For More Volvo Engine workshop information, please visit


Engine Measurements-Checking Volvo Diesel Engine

More Information About Volvo Engine Measurements


 


Contact Us
  • Add.: Room 601, Laboratory Building, No.2 Gaohua Road, Nanning, Guangxi, China.
  • Tel.: +86 771 5805 269
  • Fax: +86 771 5805 259
  • Cellphone: +86 134 8102 4441
                    +86 138 7819 8542
  • E-mail: sales@dieselgeneratortech.com
Follow Us

Copyright © Guangxi Dingbo Power Equipment Manufacturing Co., Ltd. All Rights Reserved | Sitemap

Update cookies preferences

seokeywords:

test2
Contact Us