Ensure cleanliness during generator set replacement and repair assembly.
Relevant Regulations for Diesel Generators: Conduct a manual start test weekly; perform a simulated mains power failure auto-start test after each major or minor repair.
The typical start-up time of a diesel generator set: From ignition to stable power generation, imported units take approximately 5-15 seconds, while domestic units range from 15-30 seconds.
It is essential to regularly inspect maintenance conditions and meticulously record operation and maintenance activities.
Navigation
Contact Us
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap