In our daily life, when the peak electricity consumption arrives and the power supply is in short supply, the power supply department will cut off the power.
Ensure cleanliness during generator set replacement and repair assembly.
Relevant Regulations for Diesel Generators: Conduct a manual start test weekly; perform a simulated mains power failure auto-start test after each major or minor repair.
The typical start-up time of a diesel generator set: From ignition to stable power generation, imported units take approximately 5-15 seconds, while domestic units range from 15-30 seconds.
Navigation
Contact Us
Copyright © Guangxi Dingbo Generator Set Manufacturing Co., Ltd. All Rights Reserved | Sitemap