1 Lubricate 88880057 Thread tap (M9) with grease in order to prevent swarf from falling into the cylinder. Screw the thread tap at least 5 mm into the copper sleeve, using 9998252 Thread cutting tool. 2 Remove tool 9998252 Thread cutting tool and 88880057 Thread tap .
2 Remove the hose (1) between the inlet manifold and the charge air cooler. Remove the electrical connection (2) from the pre-heater relay. Remove the connector (3) from the preheater element. Remove the electrical connection (4) from the charge air pressure sensor.
Shangchai SC7H230D2 diesel electric generator set technical data include Shangchai engine & alternator detailed parameters.
Removal NOTICE! Be prepared to gather up fluids. 1 Drain the coolant entirely of sufficiently for the level to be below the e-EGR coolant pipe; refer to Coolant, Change page 187. 2 Remove the check valve according to Non-return valve e-EGR, change page 163. 3 Remove the coolant pipe, outlet, from the e-EGR cooler.
Copyright © Guangxi Dingbo Power Equipment Manufacturing Co., Ltd. All Rights Reserved | Sitemap