A lot of illustration contains standardized symbols and colors. Please refer to the following information to reduce misunderstanding when working on an engine / transmission using this workshop manual.
Removal 1 Check, and where necessary adjust, valve clearances according to Valves, Adjustment page 49. 2 Remove the injectors; refer to Injector, Change page 123. 3 Remove the electrical connection to the control valve.
Normal Starting Procedure & light load operation of Perkins standby generating sets
The object of the measurement is to determine selection of the cylinder head gasket. Clean the mating surface, the cylinder block sealing surfaces and the cylinder head. Use cleaning spirits and 885516 Gasket scraper. Install spacers (3) and 9998678 Gauge rod (1) on the engine block sealing surface. Set the dial indicator (2) to ”0”.
Copyright © Guangxi Dingbo Power Equipment Manufacturing Co., Ltd. All Rights Reserved | Sitemap